Who it's for
The approvals to open a restaurant in Victoria, or a café or bar, come from different places: council, Liquor Control Victoria (LCV) and your building surveyor. Each has its own timeframe, and they depend on each other. This is for you if:
- You've signed a lease, or are about to
- You're fitting out a new café, restaurant, bar or brewery
- You're not sure which permits and licences apply
- You want one team handling council and LCV together
Not you? Still looking at sites? Start with check a site before you sign.
Your options
Approvals table
Most new venues need several of these. We tell you which ones yours needs.
- Planning permit — From council, for the use (if the zone needs one) and for building works. Since VC286 it's no longer needed just to sell liquor. → /planning-permits/new-venue
- Liquor licence — From LCV. The type depends on how you'll trade: with meals, as a bar, or takeaway. → /liquor-licence/new
- Outdoor dining — A council footpath trading permit, plus that area added to the licence. → /planning-permits/outdoor-dining
- Red line plan — The plan showing where liquor can be served. Drawn in-house and included with every licence application. → /liquor-licence/red-line-plan
- Building and food registration — Building permit and occupancy from your building surveyor; food business registration with council. Yours or your builder's to get; we coordinate the timing.
Approvals to open a restaurant: the right order
Planning comes first. The planning permit sets the ceiling on what the liquor licence can ever be: hours, patrons, licensed area and music. A licence that asks for more than the permit allows has to be fixed before you can trade that way.
Then the licence. Once the floor plans are settled, we draw the red line plan and lodge the application within 10 business days of receiving your documents. Most new licences must then display a public notice on site for 28 days, followed by a signed Statement of Display (an affirmation that the notice was up).
Footpath trading, building and food registration run alongside. Footpath permits are council local-law permits, separate from planning, and the rules vary by council.

Speak with Jacob
Principal. Twelve years running venues and working inside local government.
The first conversation is free.
Book a 15-minute call(03) 7064 8477We reply within 24 hours.
How it works
Four steps for most new venues.
- 15-minute call We confirm which approvals you need and fix the fee.
- Online form and documents You answer our questions and upload documents through your client portal, from any device.
- We prepare, you sign off Applications, red line plan and supporting documents. Nothing is lodged until you approve it.
- We lodge and manage it to a decision We're listed as the primary contact, and we deal with council and LCV through further information requests, advertising and objections.
Fees and timing
Fixed fees, agreed before we start. Council's and LCV's own fees are separate.
- New liquor licence
- From $1,199 + GST (restaurant or café) or $1,599 + GST (other licences), red line plan included
- Planning permit
- Fixed fee, quoted before we start
- Planning decision
- 60 statutory days for a standard application, 10 business days for VicSmart; often longer
- Licence decision
- Around 12 weeks from lodgement if there are no objections
Objections add time. Police, council and neighbours can object during the 28-day notice period. We respond with submissions and, often, agreed conditions.
What we need from you
We'll ask for these through your client portal.
- The site address and your lease
- Business and director details
- Floor plans from your architect or designer
- Your planned hours, patron numbers, music and outdoor seating
- Any existing permit or licence for the site
Questions
What permits do I need to open a café in Victoria?
A café that serves alcohol needs a liquor licence and red line plan, and a footpath trading permit if you have outdoor tables. If you'll serve alcohol with meals, a restaurant and café licence usually fits. You may need a planning permit for the use or for works, depending on the zone. You'll also need a building permit and food business registration, which your builder, surveyor and council handle.
Do I need a planning permit and a liquor licence?
You need a liquor licence to sell alcohol; whether you also need a planning permit depends on the zone and your works. Since 1 July 2025 (Amendment VC286), a planning permit isn't needed just to sell or serve liquor. But the use itself, such as a restaurant or bar, may need one in some zones, and building works may too. Any existing permit still matters, because its conditions can limit what you trade.
Which approval should I get first?
Planning, then the liquor licence. The planning permit sets the ceiling on what the licence can be, so we confirm the planning position first and prepare the licence to match. Footpath permits, building permits and food registration run alongside. Getting the order wrong can mean a licence application that asks for more than the permit allows, and time lost fixing it.
How long do all the approvals take?
Usually a few months, depending on objections and workload. Council has 60 statutory days to decide a standard permit (the clock pauses for further information and notice), and real times are often longer. Allow around 12 weeks from lodgement for a straightforward new liquor licence with no objections. Running the approvals alongside the fit-out is the usual way to save time.